![]() I have had my cases postponed for many reasons in the past snow, hurricane, bomb threats, flooding to name a few. I do not know if the power was restored or what happened to the remaining matters. My client and I opted to have our matter postponed. After approximately two hours of waiting, the prosecutor agreed to re-list the attorney cases for those who did not want to wait for the “juice” in Marlton. Without a means to record the proceedings the court session could not proceed. Most importantly, the court recording system is electronic and needs power to operate. With no power the court room could not be opened. The Evesham Municipal building was without electricity. The hallway to the prosecutor’s office was dark and the prosecutor was using a flash light to review his files. In looking around the lobby it became apparent that the light in the building was not coming form the light fixtures but from the sky light. Payable violation payments (Visa and Mastercard only) can be made on the internet at. Then I realized the metal detector was not working at the security desk. Municipal Court - Violations Payments The State of New Jersey has provided a new service to our customers. ![]() I walked into the lobby of the municipal building and everything seemed normal … at first. ![]() I arrived today at Municipal Court at 8:30 am ready to defend a client. Defending clients in the Evesham Municipal court is nothing new to the firm (See Results in Evesham Township Municipal Court ). Power Outage Causes Postponements in the Evesham Municipal Court In what can only be described as “I have never seen this before,” the Evesham Municipal Court postponed a number of matters on its docket because of a power outage this morning.
0 Comments
![]() Site designations are based on environmental studies of each site and regions adjacent to the site, and on historical knowledge regarding the effects of waste disposal on areas similar to such sites in physical, chemical and biological characteristics. Ocean disposal sites are precise geographic areas within which ocean disposal is permitted subject to specific conditions in individual MPRSA permits. The permitting process for ocean disposal of dredged material requires the identification and designation of a site where materials may be disposed. Ocean Disposal Sites for Dredged Material Permits and Federal Projects Involving Dredged Materials ![]() MPRSA permits and federal projects involving ocean dumping of dredged material are subject to EPA review and concurrence.Īccording to USACE regulations ( 33 CFR 325.6 (PDF)), MPRSA permits for, and federal projects involving, the transportation of dredged material for the purpose of dumping it into ocean waters may not exceed three years. ![]() USACE relies on EPA’s ocean dumping criteria when evaluating permit requests for (and implementing federal projects involving) the transportation of dredged material for the purpose of dumping it into ocean waters. In the case of federal navigation projects, USACE may implement the MPRSA directly in the USACE projects involving ocean disposal of dredged materials. ![]() Army Corps of Engineers (USACE) is the federal agency that decides whether to issue a permit authorizing the ocean disposal of dredged materials. Under section 103 of the Marine Protection, Research and Sanctuaries Act (MPRSA), the U.S. Permits and Federal Projects Involving Dredged Material Dredged material is sediment excavated or otherwise removed from the bottoms of the navigable waters of the United States to maintain navigation channels and docks. In the United States, uncontaminated dredged material is the primary material disposed into the ocean today. Additional information about ocean dumping permits.EPA may issue special permits, research permits, emergency permits and general permits for ocean dumping. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |